Dalanao bridge feasibility study / Percival D. Tumapang et al.
Material type:
- FS CE 624.2 B411 2007
Item type | Current library | Collection | Call number | Status | Barcode | |
---|---|---|---|---|---|---|
UNDERGRADUATE THESES | Tadian Campus Library MPSU Tadian Campus Library 2nd Floor - PERIODICALS | UG Thesis-BSCE | FS CE 624.2 B411 2007 (Browse shelf(Opens below)) | Available | TTH0081 |
Browsing Tadian Campus Library shelves, Shelving location: MPSU Tadian Campus Library 2nd Floor - PERIODICALS, Collection: UG Thesis-BSCE Close shelf browser (Hides shelf browser)
FS CE 624 C749 2022 Concrete hollow blocks with crushed glass as a partial replacement of fine aggregates / | FS CE 624.177 P965 2025 Proposed crib wall design at Guinzadan Central, Bauko, Mt. Prov. / | FS CE 624.1834 L97 n.d. C.E 525 project study / | FS CE 624.2 B411 2007 Dalanao bridge feasibility study / | FS CE 624.2 C129 2006 Boga bridge feasibility study / | FS CE 624.2 P949 2024 Proposed Apawan bridge design in Sumadel, Tadian, Mountain Province / | FS CE 624.28 C753 2016 Conditions of existing bridges constructed by the DPWH.MPDEO in district 1 Mountain Province / Bobby A. Fokleg, Jr. et al. |
The proposed project is located at dalanao, north of Poblacion, Paracelis Mountain Province, along the national road traversing the town going to the Province of Kalinga. The proposed project was decided because of the dilapidated condition of the existing bailey bridge.
The proposed project is a two lane composite bridge, a bridge that has a concrete deck with high strength steel girders that acts as the longitudinal main load-bearing members anchored on reinforced concrete abutments. Such type of bridge is selected because it is economical and at the same time lightweight but structurally rigid type of construction.
The researchers concluded that the proposed project is basically feasible although it is not financial feasible from the result of the BCR, however, it is concluded that the presentation and analysis of the maintenance cost of the bailey bridge proved to be a factor that could justify its financial viability. It is also concluded that the project, having complied with all the standard specifications of bridge construction will reach its lifespan of 50 years.